Georgia Power IC-205 (IC-205)

Georgia Power IC-205 is a 630.0 MW gas interconnection project in Effingham County, Georgia with a current status of withdrawn. It is proposed to connect at West McIntosh 230 kV Substation.

630.0 MWCapacity
WithdrawnStatus
GAMarket
GasTechnology

Project facts

Canonical nameGeorgia Power IC-205
Queue IDIC-205
Statuswithdrawn
Source status—
MarketGA
TechnologyGas
Capacity630.0 MW
StateGeorgia
CountyEffingham County
Point of interconnectionWest McIntosh 230 kV Substation
Requested (queue) date2003-09-10
Proposed in-service date—
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerGeorgia Power

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_project—withdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-11-26

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.