Georgia Power IC-206 (IC-206)

Georgia Power IC-206 is a 1,195.0 MW gas interconnection project in Heard County, Georgia with a current status of withdrawn. It is proposed to connect at Wansley 500 kV Substation.

1,195.0 MWCapacity
WithdrawnStatus
GAMarket
GasTechnology

Project facts

Canonical nameGeorgia Power IC-206
Queue IDIC-206
Statuswithdrawn
Source status
MarketGA
TechnologyGas
Capacity1,195.0 MW
StateGeorgia
CountyHeard County
Point of interconnectionWansley 500 kV Substation
Requested (queue) date2003-09-10
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerGeorgia Power

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata