Georgia Power IC-225 (IC-225)

Georgia Power IC-225 is a 386.0 MW gas interconnection project in Jackson County, Georgia with a current status of withdrawn. It is proposed to connect at Athens - Center Primary 115 kV Line.

386.0 MWCapacity
WithdrawnStatus
GAMarket
GasTechnology

Project facts

Canonical nameGeorgia Power IC-225
Queue IDIC-225
Statuswithdrawn
Source status
MarketGA
TechnologyGas
Capacity386.0 MW
StateGeorgia
CountyJackson County
Point of interconnectionAthens - Center Primary 115 kV Line
Requested (queue) date2007-12-05
Proposed in-service date
Operational date
Withdrawn date2008-12-17
Developer
Utility / transmission ownerGeorgia Power

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.