Georgia Power IC-230 (IC-230)

Georgia Power IC-230 is a 487.2 MW gas interconnection project in Cobb County, Georgia with a current status of operational. It is proposed to connect at Atkinson Substation 115 kV Bus.

487.2 MWCapacity
OperationalStatus
GAMarket
GasTechnology

Project facts

Canonical nameGeorgia Power IC-230
Queue IDIC-230
Statusoperational
Source statusCommercial Operation
MarketGA
TechnologyGas
Capacity487.2 MW
StateGeorgia
CountyCobb County
Point of interconnectionAtkinson Substation 115 kV Bus
Requested (queue) date2009-07-30
Proposed in-service date2010-02-15
Operational date2010-02-15
Withdrawn date
Developer
Utility / transmission ownerGeorgia Power

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.