Georgia Power IC-244 (IC-244)

Georgia Power IC-244 is a 4,375.0 MW gas interconnection project in Hancock County, Georgia with a current status of withdrawn. It is proposed to connect at Scherer - Warthen 500 kV Line.

4,375.0 MWCapacity
WithdrawnStatus
GAMarket
GasTechnology

Project facts

Canonical nameGeorgia Power IC-244
Queue IDIC-244
Statuswithdrawn
Source statusRequest Withdrawn
MarketGA
TechnologyGas
Capacity4,375.0 MW
StateGeorgia
CountyHancock County
Point of interconnectionScherer - Warthen 500 kV Line
Requested (queue) date2010-08-09
Proposed in-service date2014-01-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerGeorgia Power

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata