Georgia Power IC-262 (IC-262)
Georgia Power IC-262 is a 16.0 MW solar interconnection project in Mitchell County, Georgia with a current status of operational. It is proposed to connect at Cotton Primary Substation 46 kV Bus.
16.0 MWCapacity
OperationalStatus
GAMarket
SolarTechnology
Project facts
| Canonical name | Georgia Power IC-262 |
|---|---|
| Queue ID | IC-262 |
| Status | operational |
| Source status | Commercial Operation |
| Market | GA |
| Technology | Solar |
| Capacity | 16.0 MW |
| State | Georgia |
| County | Mitchell County |
| Point of interconnection | Cotton Primary Substation 46 kV Bus |
| Requested (queue) date | 2011-10-19 |
| Proposed in-service date | 2013-11-11 |
| Operational date | 2013-11-11 |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Georgia Power |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata