Georgia Power IC-335 (IC-335)

Georgia Power IC-335 is a 80.0 MW solar interconnection project in Dodge County, Georgia with a current status of withdrawn. It is proposed to connect at Eastman Primary - Vidalia 115 kV Line.

80.0 MWCapacity
WithdrawnStatus
GAMarket
SolarTechnology

Project facts

Canonical nameGeorgia Power IC-335
Queue IDIC-335
Statuswithdrawn
Source statusRequest Withdrawn
MarketGA
TechnologySolar
Capacity80.0 MW
StateGeorgia
CountyDodge County
Point of interconnectionEastman Primary - Vidalia 115 kV Line
Requested (queue) date2014-02-19
Proposed in-service date2016-06-30
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerGeorgia Power

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_project—withdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-11-26

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata