Georgia Power IC-345 (IC-345)

Georgia Power IC-345 is a 250.0 MW solar interconnection project in Glynn County, Georgia with a current status of withdrawn. It is proposed to connect at Thalmann TS 230 kV Bus.

250.0 MWCapacity
WithdrawnStatus
GAMarket
SolarTechnology

Project facts

Canonical nameGeorgia Power IC-345
Queue IDIC-345
Statuswithdrawn
Source statusRequest Withdrawn
MarketGA
TechnologySolar
Capacity250.0 MW
StateGeorgia
CountyGlynn County
Point of interconnectionThalmann TS 230 kV Bus
Requested (queue) date2014-03-14
Proposed in-service date2016-02-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerGeorgia Power

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.