Georgia Power IC-379 (IC-379)

Georgia Power IC-379 is a 19.6 MW solar interconnection project in Taylor County, Georgia with a current status of operational. It is proposed to connect at Butler - Geneva 46 kV Line.

19.6 MWCapacity
OperationalStatus
GAMarket
SolarTechnology

Project facts

Canonical nameGeorgia Power IC-379
Queue IDIC-379
Statusoperational
Source statusCommercial Operation
MarketGA
TechnologySolar
Capacity19.6 MW
StateGeorgia
CountyTaylor County
Point of interconnectionButler - Geneva 46 kV Line
Requested (queue) date2014-05-06
Proposed in-service date2015-11-01
Operational date2015-11-01
Withdrawn date
Developer
Utility / transmission ownerGeorgia Power

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata