Georgia Power IC-393 (IC-393)

Georgia Power IC-393 is a 20.0 MW solar interconnection project in Jenkins County, Georgia with a current status of operational. It is proposed to connect at Millen Primary Substation.

20.0 MWCapacity
OperationalStatus
GAMarket
SolarTechnology

Project facts

Canonical nameGeorgia Power IC-393
Queue IDIC-393
Statusoperational
Source statusCommercial Operation
MarketGA
TechnologySolar
Capacity20.0 MW
StateGeorgia
CountyJenkins County
Point of interconnectionMillen Primary Substation
Requested (queue) date2014-08-21
Proposed in-service date2015-11-01
Operational date2015-11-01
Withdrawn date
Developer
Utility / transmission ownerGeorgia Power

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata