Georgia Power IC-435 (IC-435)

Georgia Power IC-435 is a 143.0 MW solar interconnection project in Taylor County, Georgia with a current status of withdrawn. It is proposed to connect at Butler - Talbot County #1 230 kV Line.

143.0 MWCapacity
WithdrawnStatus
GAMarket
SolarTechnology

Project facts

Canonical nameGeorgia Power IC-435
Queue IDIC-435
Statuswithdrawn
Source statusRequest Withdrawn
MarketGA
TechnologySolar
Capacity143.0 MW
StateGeorgia
CountyTaylor County
Point of interconnectionButler - Talbot County #1 230 kV Line
Requested (queue) date2016-02-19
Proposed in-service date2017-09-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerGeorgia Power

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata