Georgia Power IC-453 (IC-453)

Georgia Power IC-453 is a 160.0 MW solar interconnection project in Mitchell County, Georgia with a current status of operational. It is proposed to connect at Raccoon Creek - Thomasville 230 kV Line.

160.0 MWCapacity
OperationalStatus
GAMarket
SolarTechnology

Project facts

Canonical nameGeorgia Power IC-453
Queue IDIC-453
Statusoperational
Source statusCommercial Operation
MarketGA
TechnologySolar
Capacity160.0 MW
StateGeorgia
CountyMitchell County
Point of interconnectionRaccoon Creek - Thomasville 230 kV Line
Requested (queue) date2016-04-26
Proposed in-service date2019-04-01
Operational date2019-04-01
Withdrawn date
Developer
Utility / transmission ownerGeorgia Power

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata