Georgia Power IC-481 (IC-481)
Georgia Power IC-481 is a 98.1 MW solar interconnection project in Macon County, Georgia with a current status of withdrawn. It is proposed to connect at North Americus - Perry 115 kV Line.
98.1 MWCapacity
WithdrawnStatus
GAMarket
SolarTechnology
Project facts
| Canonical name | Georgia Power IC-481 |
|---|---|
| Queue ID | IC-481 |
| Status | withdrawn |
| Source status | GIA Terminated |
| Market | GA |
| Technology | Solar |
| Capacity | 98.1 MW |
| State | Georgia |
| County | Macon County |
| Point of interconnection | North Americus - Perry 115 kV Line |
| Requested (queue) date | 2016-08-12 |
| Proposed in-service date | 2020-09-01 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Georgia Power |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata