Georgia Power IC-492 (IC-492)

Georgia Power IC-492 is a 50.5 MW solar interconnection project in Houston County, Georgia with a current status of withdrawn. It is proposed to connect at Robins AFB #4 - W.D. Fowler 115 kV Substation.

50.5 MWCapacity
WithdrawnStatus
GAMarket
SolarTechnology

Project facts

Canonical nameGeorgia Power IC-492
Queue IDIC-492
Statuswithdrawn
Source status
MarketGA
TechnologySolar
Capacity50.5 MW
StateGeorgia
CountyHouston County
Point of interconnectionRobins AFB #4 - W.D. Fowler 115 kV Substation
Requested (queue) date2016-09-06
Proposed in-service date
Operational date
Withdrawn date2017-05-04
Developer
Utility / transmission ownerGeorgia Power

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.