Georgia Power IC-503 (IC-503)

Georgia Power IC-503 is a 80.0 MW solar interconnection project in Oglethorpe County, Georgia with a current status of withdrawn. It is proposed to connect at East Watkinsville - Russell Dam (USA) 230 kV Line.

80.0 MWCapacity
WithdrawnStatus
GAMarket
SolarTechnology

Project facts

Canonical nameGeorgia Power IC-503
Queue IDIC-503
Statuswithdrawn
Source status
MarketGA
TechnologySolar
Capacity80.0 MW
StateGeorgia
CountyOglethorpe County
Point of interconnectionEast Watkinsville - Russell Dam (USA) 230 kV Line
Requested (queue) date2016-09-21
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerGeorgia Power

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata