Georgia Power IC-575 (IC-575)

Georgia Power IC-575 is a 83.0 MW solar interconnection project in Mitchell County, Georgia with a current status of withdrawn. It is proposed to connect at Cotton Primary Substation 230 kV Bus.

83.0 MWCapacity
WithdrawnStatus
GAMarket
SolarTechnology

Project facts

Canonical nameGeorgia Power IC-575
Queue IDIC-575
Statuswithdrawn
Source statusGIA Terminated
MarketGA
TechnologySolar
Capacity83.0 MW
StateGeorgia
CountyMitchell County
Point of interconnectionCotton Primary Substation 230 kV Bus
Requested (queue) date2017-01-09
Proposed in-service date2020-12-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerGeorgia Power

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.