Georgia Power IC-583 (IC-583)

Georgia Power IC-583 is a 160.0 MW solar interconnection project in Crawford County, Georgia with a current status of withdrawn. It is proposed to connect at Dorsett - Thomaston 230 kV Line.

160.0 MWCapacity
WithdrawnStatus
GAMarket
SolarTechnology

Project facts

Canonical nameGeorgia Power IC-583
Queue IDIC-583
Statuswithdrawn
Source statusGIA Terminated
MarketGA
TechnologySolar
Capacity160.0 MW
StateGeorgia
CountyCrawford County
Point of interconnectionDorsett - Thomaston 230 kV Line
Requested (queue) date2017-01-26
Proposed in-service date2021-01-15
Operational date
Withdrawn date
Developer
Utility / transmission ownerGeorgia Power

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata