Georgia Power IC-589 (IC-589)

Georgia Power IC-589 is a 195.5 MW solar interconnection project in Mitchell County, Georgia with a current status of withdrawn. It is proposed to connect at Scooter Substation 230 kV Bus.

195.5 MWCapacity
WithdrawnStatus
GAMarket
SolarTechnology

Project facts

Canonical nameGeorgia Power IC-589
Queue IDIC-589
Statuswithdrawn
Source status
MarketGA
TechnologySolar
Capacity195.5 MW
StateGeorgia
CountyMitchell County
Point of interconnectionScooter Substation 230 kV Bus
Requested (queue) date2017-01-27
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerGeorgia Power

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata