Georgia Power IC-613 (IC-613)

Georgia Power IC-613 is a 260.0 MW solar interconnection project in Jefferson County, Georgia with a current status of withdrawn. It is proposed to connect at Vidalia - Wadley Primary (White) 230 kV Line.

260.0 MWCapacity
WithdrawnStatus
GAMarket
SolarTechnology

Project facts

Canonical nameGeorgia Power IC-613
Queue IDIC-613
Statuswithdrawn
Source statusRequest Withdrawn
MarketGA
TechnologySolar
Capacity260.0 MW
StateGeorgia
CountyJefferson County
Point of interconnectionVidalia - Wadley Primary (White) 230 kV Line
Requested (queue) date2017-03-16
Proposed in-service date2018-09-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerGeorgia Power

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata