Georgia Power IC-649 (IC-649)

Georgia Power IC-649 is a 150.0 MW solar interconnection project in Brooks County, Georgia with a current status of withdrawn. It is proposed to connect at Thomasville - West Valdosta 230 kV Line.

150.0 MWCapacity
WithdrawnStatus
GAMarket
SolarTechnology

Project facts

Canonical nameGeorgia Power IC-649
Queue IDIC-649
Statuswithdrawn
Source statusRequest Withdrawn
MarketGA
TechnologySolar
Capacity150.0 MW
StateGeorgia
CountyBrooks County
Point of interconnectionThomasville - West Valdosta 230 kV Line
Requested (queue) date2017-08-08
Proposed in-service date2021-04-01
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerGeorgia Power

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_project—withdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-11-26

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata