Georgia Power IC-652 (IC-652)

Georgia Power IC-652 is a 615.0 MW solar interconnection project in Sumter County, Georgia with a current status of active. It is proposed to connect at Fortson - North Tifton 500 kV Line.

615.0 MWCapacity
ActiveStatus
GAMarket
SolarTechnology

Project facts

Canonical nameGeorgia Power IC-652
Queue IDIC-652
Statusactive
Source statusGIA with NTP
MarketGA
TechnologySolar
Capacity615.0 MW
StateGeorgia
CountySumter County
Point of interconnectionFortson - North Tifton 500 kV Line
Requested (queue) date2017-09-13
Proposed in-service date2023-07-15
Operational date
Withdrawn date
Developer
Utility / transmission ownerGeorgia Power

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata