Georgia Power IC-662 (IC-662)

Georgia Power IC-662 is a 57.5 MW solar interconnection project in Mitchell County, Georgia with a current status of operational. It is proposed to connect at Cotton Primary Substation 230 kV Bus.

57.5 MWCapacity
OperationalStatus
GAMarket
SolarTechnology

Project facts

Canonical nameGeorgia Power IC-662
Queue IDIC-662
Statusoperational
Source statusCommercial Operation
MarketGA
TechnologySolar
Capacity57.5 MW
StateGeorgia
CountyMitchell County
Point of interconnectionCotton Primary Substation 230 kV Bus
Requested (queue) date2017-12-20
Proposed in-service date2020-01-31
Operational date2020-01-31
Withdrawn date
Developer
Utility / transmission ownerGeorgia Power

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata