Georgia Power IC-738 (IC-738)

Georgia Power IC-738 is a 14.5 MW gas interconnection project in Spalding County, Georgia with a current status of withdrawn. It is proposed to connect at LLoyd Shoals - South Griffin 115 kV Line.

14.5 MWCapacity
WithdrawnStatus
GAMarket
GasTechnology

Project facts

Canonical nameGeorgia Power IC-738
Queue IDIC-738
Statuswithdrawn
Source statusRequest Withdrawn
MarketGA
TechnologyGas
Capacity14.5 MW
StateGeorgia
CountySpalding County
Point of interconnectionLLoyd Shoals - South Griffin 115 kV Line
Requested (queue) date2018-09-19
Proposed in-service date2019-06-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerGeorgia Power

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.