Georgia Power IC-742 (IC-742)

Georgia Power IC-742 is a 80.0 MW solar interconnection project in Ware County, Georgia with a current status of operational. It is proposed to connect at Douglas - Kettle Creek Primary 230 kV Line.

80.0 MWCapacity
OperationalStatus
GAMarket
SolarTechnology

Project facts

Canonical nameGeorgia Power IC-742
Queue IDIC-742
Statusoperational
Source statusCommercial Operation
MarketGA
TechnologySolar
Capacity80.0 MW
StateGeorgia
CountyWare County
Point of interconnectionDouglas - Kettle Creek Primary 230 kV Line
Requested (queue) date2018-10-22
Proposed in-service date2023-05-01
Operational date2023-05-01
Withdrawn date
Developer
Utility / transmission ownerGeorgia Power

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata