Georgia Power IC-743 (IC-743)

Georgia Power IC-743 is a 40.0 MW solar interconnection project in Elbert County, Georgia with a current status of operational. It is proposed to connect at Anthony Shoals - Heardmont 115 kV Line.

40.0 MWCapacity
OperationalStatus
GAMarket
SolarTechnology

Project facts

Canonical nameGeorgia Power IC-743
Queue IDIC-743
Statusoperational
Source statusCommercial Operation
MarketGA
TechnologySolar
Capacity40.0 MW
StateGeorgia
CountyElbert County
Point of interconnectionAnthony Shoals - Heardmont 115 kV Line
Requested (queue) date2018-10-22
Proposed in-service date2021-06-30
Operational date2021-06-30
Withdrawn date
Developer
Utility / transmission ownerGeorgia Power

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata