Georgia Power IC-759 (IC-759)

Georgia Power IC-759 is a 40.0 MW solar interconnection project in Burke County, Georgia with a current status of operational. It is proposed to connect at Sylvania - Waynesboro Primary 115 kV Line.

40.0 MWCapacity
OperationalStatus
GAMarket
SolarTechnology

Project facts

Canonical nameGeorgia Power IC-759
Queue IDIC-759
Statusoperational
Source statusCommercial Operation
MarketGA
TechnologySolar
Capacity40.0 MW
StateGeorgia
CountyBurke County
Point of interconnectionSylvania - Waynesboro Primary 115 kV Line
Requested (queue) date2018-12-06
Proposed in-service date2023-05-01
Operational date2023-05-01
Withdrawn date
Developer
Utility / transmission ownerGeorgia Power

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.