Georgia Power IC-859 (IC-859)

Georgia Power IC-859 is a 65.0 MW battery interconnection project in Talbot County, Georgia with a current status of operational. It is proposed to connect at Mossy Branch Substation 115 kV Bus.

65.0 MWCapacity
OperationalStatus
GAMarket
BatteryTechnology

Project facts

Canonical nameGeorgia Power IC-859
Queue IDIC-859
Statusoperational
Source statusCommercial Operation
MarketGA
TechnologyBattery
Capacity65.0 MW
StateGeorgia
CountyTalbot County
Point of interconnectionMossy Branch Substation 115 kV Bus
Requested (queue) date2020-04-07
Proposed in-service date2023-05-03
Operational date2023-05-03
Withdrawn date
Developer
Utility / transmission ownerGeorgia Power

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata