Georgia Power IC-889 (IC-889)

Georgia Power IC-889 is a 150.2 MW solar interconnection project in Dodge County, Georgia with a current status of withdrawn. It is proposed to connect at Bonaire Primary - Eastman Primary 115 kV Line.

150.2 MWCapacity
WithdrawnStatus
GAMarket
SolarTechnology

Project facts

Canonical nameGeorgia Power IC-889
Queue IDIC-889
Statuswithdrawn
Source statusGIA Terminated
MarketGA
TechnologySolar
Capacity150.2 MW
StateGeorgia
CountyDodge County
Point of interconnectionBonaire Primary - Eastman Primary 115 kV Line
Requested (queue) date2020-07-22
Proposed in-service date2023-07-25
Operational date
Withdrawn date
Developer
Utility / transmission ownerGeorgia Power

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata