Georgia Power IC-905 (IC-905)

Georgia Power IC-905 is a 150.0 MW battery interconnection project in Putnam County, Georgia with a current status of active. It is proposed to connect at Branch Substation 230 kV Bus.

150.0 MWCapacity
ActiveStatus
GAMarket
BatteryTechnology

Project facts

Canonical nameGeorgia Power IC-905
Queue IDIC-905
Statusactive
Source statusGIA Executed; NTP Pending
MarketGA
TechnologyBattery
Capacity150.0 MW
StateGeorgia
CountyPutnam County
Point of interconnectionBranch Substation 230 kV Bus
Requested (queue) date2020-10-07
Proposed in-service date2027-10-07
Operational date
Withdrawn date
Developer
Utility / transmission ownerGeorgia Power

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata