Georgia Power IC-932 (IC-932)

Georgia Power IC-932 is a 250.0 MW solar interconnection project in Glynn County, Georgia with a current status of active. It is proposed to connect at Thalmann TS 230 kV Bus.

250.0 MWCapacity
ActiveStatus
GAMarket
SolarTechnology

Project facts

Canonical nameGeorgia Power IC-932
Queue IDIC-932
Statusactive
Source statusGIA with NTP
MarketGA
TechnologySolar
Capacity250.0 MW
StateGeorgia
CountyGlynn County
Point of interconnectionThalmann TS 230 kV Bus
Requested (queue) date2020-12-21
Proposed in-service date2024-11-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerGeorgia Power

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.