Georgia Power IC-988 (IC-988)

Georgia Power IC-988 is a 120.0 MW solar interconnection project in Oglethorpe County, Georgia with a current status of withdrawn. It is proposed to connect at East Watkinsville - Russell Dam (USA) 230 kV Line.

120.0 MWCapacity
WithdrawnStatus
GAMarket
SolarTechnology

Project facts

Canonical nameGeorgia Power IC-988
Queue IDIC-988
Statuswithdrawn
Source statusGIA Terminated
MarketGA
TechnologySolar
Capacity120.0 MW
StateGeorgia
CountyOglethorpe County
Point of interconnectionEast Watkinsville - Russell Dam (USA) 230 kV Line
Requested (queue) date2021-10-21
Proposed in-service date2025-07-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerGeorgia Power

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata