Georgia Power IC-994 (IC-994)

Georgia Power IC-994 is a 200.0 MW solar interconnection project in Toombs County, Georgia with a current status of active. It is proposed to connect at Hatch - Vidalia 230 kV Line.

200.0 MWCapacity
ActiveStatus
GAMarket
SolarTechnology

Project facts

Canonical nameGeorgia Power IC-994
Queue IDIC-994
Statusactive
Source statusGIA in Suspension
MarketGA
TechnologySolar
Capacity200.0 MW
StateGeorgia
CountyToombs County
Point of interconnectionHatch - Vidalia 230 kV Line
Requested (queue) date2021-11-12
Proposed in-service date2026-03-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerGeorgia Power

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.