GERALDANDRUS SES SWITCHYARD-INDIANOLA 230 KV (J2869)

GERALDANDRUS SES SWITCHYARD-INDIANOLA 230 KV is a 150.0 MW solar interconnection project in Sunflower, Mississippi with a current status of withdrawn. It is proposed to connect at GERALDANDRUS SES SWITCHYARD-INDIANOLA 230 KV.

150.0 MWCapacity
WithdrawnStatus
—Market
SolarTechnology

Project facts

Canonical nameGERALDANDRUS SES SWITCHYARD-INDIANOLA 230 KV
Queue IDJ2869
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologySolar
Capacity150.0 MW
StateMississippi
CountySunflower
Point of interconnectionGERALDANDRUS SES SWITCHYARD-INDIANOLA 230 KV
Requested (queue) date2022-09-15
Proposed in-service date2027-06-01
Operational date2027-06-01
Withdrawn date2026-10-20
Developer—
Utility / transmission ownerMISO

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-11-05withdrawn_date—2026-10-20high
2026-11-05statusoperationalwithdrawnhigh
2026-10-31phasePhase 2Phase 3low
2026-10-14phasePhase 1Phase 2low
2026-07-29new_project—operationalhigh

Explore related data

Source last checked2026-11-28
Data last materially changed2026-11-28
Page data generated2026-11-28

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata