Gering Solar (70127_GEN1)

Gering Solar is a 4.0 MW solar interconnection project in Scotts Bluff, Nebraska with a current status of operational.

4.0 MWCapacity
OperationalStatus
WACMMarket
SolarTechnology

Project facts

Canonical nameGering Solar
Queue ID70127_GEN1
Statusoperational
Source status(OP) Operating
MarketWACM
TechnologySolar
Capacity4.0 MW
StateNebraska
CountyScotts Bluff
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2025-07-01
Withdrawn date
Developer
Utility / transmission ownerSE Municipal Nebraska, LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata