GEYSERS WIND PROJECT (29)

GEYSERS WIND PROJECT is a 201.0 MW wind interconnection project in Lake/sonoma, California with a current status of withdrawn. It is proposed to connect at Collector Sub at Geysers #17 Fulton 230 kV line.

201.0 MWCapacity
WithdrawnStatus
Market
WindTechnology

Project facts

Canonical nameGEYSERS WIND PROJECT
Queue ID29
Statuswithdrawn
Source statusWITHDRAWN
Market
TechnologyWind
Capacity201.0 MW
StateCalifornia
CountyLake/sonoma
Point of interconnectionCollector Sub at Geysers #17 Fulton 230 kV line
Requested (queue) date2004-03-29
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerPGAE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.