Gibson Sta - Bedford 345 345.0kV (J3897)

Gibson Sta - Bedford 345 345.0kV is a 60.0 MW solar interconnection project in Knox, Indiana with a current status of withdrawn. It is proposed to connect at Gibson Sta - Bedford 345 345.0kV.

60.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameGibson Sta - Bedford 345 345.0kV
Queue IDJ3897
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity60.0 MW
StateIndiana
CountyKnox
Point of interconnectionGibson Sta - Bedford 345 345.0kV
Requested (queue) date2025-02-07
Proposed in-service date2030-09-01
Operational date2030-09-01
Withdrawn date2026-04-14
Developer
Utility / transmission ownerDuke Energy Progress

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.