Giga Texas Data Center (25INR0688)

Giga Texas Data Center is a 133.0 MW other interconnection project in Travis, Texas with a current status of operational. It is proposed to connect at HORNSBY Substation POIB# 7047 Site will be connected behind the meter at Medium Voltage 24.9 kV with non export controls GSU TRANSFORMER 80/106/133MVA 345kV DELTA PRIMARY 24.9kV WYE-G SECONDARY Z=XX%, 65DEG C RISE.

133.0 MWCapacity
OperationalStatus
TravisMarket
OtherTechnology

Project facts

Canonical nameGiga Texas Data Center
Queue ID25INR0688
Statusoperational
Source statusSS Completed, FIS Completed, IA
MarketTravis
TechnologyOther
Capacity133.0 MW
StateTexas
CountyTravis
Point of interconnectionHORNSBY Substation POIB# 7047 Site will be connected behind the meter at Medium Voltage 24.9 kV with non export controls GSU TRANSFORMER 80/106/133MVA 345kV DELTA PRIMARY 24.9kV WYE-G SECONDARY Z=XX%, 65DEG C RISE
Requested (queue) date2024-08-27
Proposed in-service date
Operational date2025-12-15
Withdrawn date
DeveloperGiga Texas Energy, LLC.
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata