Glendale Heights 10-SLCHI910 (68137_CH910)

Glendale Heights 10-SLCHI910 is a 1.3 MW solar interconnection project in DuPage, Illinois with a current status of active.

1.3 MWCapacity
ActiveStatus
PJMMarket
SolarTechnology

Project facts

Canonical nameGlendale Heights 10-SLCHI910
Queue ID68137_CH910
Statusactive
Source status(U) Under construction, less than or equal to 50 percent complete
MarketPJM
TechnologySolar
Capacity1.3 MW
StateIllinois
CountyDuPage
Point of interconnection
Requested (queue) date
Proposed in-service date2027-02-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerPrologis Logistics Services Incorporated

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectactivehigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.