Goat Mountain BESS 2 (26INR0611)

Goat Mountain BESS 2 is a 100.7 MW other interconnection project in Sterling, Texas with a current status of operational. It is proposed to connect at 76030-Gasconades Creek 345 kV.

100.7 MWCapacity
OperationalStatus
SterlingMarket
OtherTechnology

Project facts

Canonical nameGoat Mountain BESS 2
Queue ID26INR0611
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketSterling
TechnologyOther
Capacity100.7 MW
StateTexas
CountySterling
Point of interconnection76030-Gasconades Creek 345 kV
Requested (queue) date2025-01-28
Proposed in-service date
Operational date2027-06-01
Withdrawn date
DeveloperGoat Wind LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.