Goat Mountain Wind-Repower (27INR0367)

Goat Mountain Wind-Repower is a 303.2 MW other interconnection project in Sterling, Texas with a current status of operational. It is proposed to connect at 76030 Gasconades Creek 345kV.

303.2 MWCapacity
OperationalStatus
SterlingMarket
OtherTechnology

Project facts

Canonical nameGoat Mountain Wind-Repower
Queue ID27INR0367
Statusoperational
Source statusSS Completed, FIS Completed, IA
MarketSterling
TechnologyOther
Capacity303.2 MW
StateTexas
CountySterling
Point of interconnection76030 Gasconades Creek 345kV
Requested (queue) date2025-01-13
Proposed in-service date
Operational date2027-06-01
Withdrawn date
DeveloperGoat Wind LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata