Gold 115 kV II (AG1-392A - moved to TC1)

Gold 115 kV II is a 30.0 MW solar interconnection project in Potter, Pennsylvania with a current status of withdrawn.

30.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameGold 115 kV II
Queue IDAG1-392A - moved to TC1
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity30.0 MW
StatePennsylvania
CountyPotter
Point of interconnection
Requested (queue) date2020-10-01
Proposed in-service date2022-06-01
Operational date
Withdrawn date2025-01-22
Developer
Utility / transmission ownerPENELEC

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata