Gold 115 kV (AE2-146)

Gold 115 kV is a 183.0 MW solar interconnection project in Potter, Pennsylvania with a current status of withdrawn.

183.0 MWCapacity
WithdrawnStatus
—Market
SolarTechnology

Project facts

Canonical nameGold 115 kV
Queue IDAE2-146
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologySolar
Capacity183.0 MW
StatePennsylvania
CountyPotter
Point of interconnection—
Requested (queue) date2019-03-11
Proposed in-service date2021-03-05
Operational date—
Withdrawn date2019-09-04
Developer—
Utility / transmission ownerPENELEC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-10-11
Data last materially changed2026-10-11
Page data generated2026-10-11

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.