GOLDEN HILLS 1 WIND (708)

GOLDEN HILLS 1 WIND is a 50.0 MW wind interconnection project in Alameda, California with a current status of withdrawn. It is proposed to connect at Tesla - Keslo 230 KV.

50.0 MWCapacity
WithdrawnStatus
Market
WindTechnology

Project facts

Canonical nameGOLDEN HILLS 1 WIND
Queue ID708
Statuswithdrawn
Source statusWITHDRAWN
Market
TechnologyWind
Capacity50.0 MW
StateCalifornia
CountyAlameda
Point of interconnectionTesla - Keslo 230 KV
Requested (queue) date2011-03-31
Proposed in-service date
Operational date
Withdrawn date2013-05-03
Developer
Utility / transmission ownerPGAE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.