GOLDENEYE ENERGY STORAGE CENTER is a 20.0 MW battery interconnection project in Contra Costa, California with a current status of withdrawn. It is proposed to connect at 230 kV bus at the Kelso Substation via the Mariposa Energy 230 kV tie line.
20.0 MWCapacity
WithdrawnStatus
—Market
BatteryTechnology
Project facts
| Canonical name | GOLDENEYE ENERGY STORAGE CENTER |
|---|---|
| Queue ID | 1105 |
| Status | withdrawn |
| Source status | WITHDRAWN |
| Market | — |
| Technology | Battery |
| Capacity | 20.0 MW |
| State | California |
| County | Contra Costa |
| Point of interconnection | 230 kV bus at the Kelso Substation via the Mariposa Energy 230 kV tie line |
| Requested (queue) date | 2015-04-30 |
| Proposed in-service date | — |
| Operational date | — |
| Withdrawn date | 2016-04-26 |
| Developer | — |
| Utility / transmission owner | PGAE |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-29 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata