Goldthwaite Wind Energy Facility (58321_1)

Goldthwaite Wind Energy Facility is a 150.0 MW wind interconnection project in Mills, Texas with a current status of operational.

150.0 MWCapacity
OperationalStatus
ERCOMarket
WindTechnology

Project facts

Canonical nameGoldthwaite Wind Energy Facility
Queue ID58321_1
Statusoperational
Source status(OP) Operating
MarketERCO
TechnologyWind
Capacity150.0 MW
StateTexas
CountyMills
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2013-12-01
Withdrawn date
Developer
Utility / transmission ownerInvenergy

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata