GOLDWICK SOLAR FARM (1377)

GOLDWICK SOLAR FARM is a 101.4 MW solar+battery interconnection project in Stanislaus, California with a current status of withdrawn. It is proposed to connect at Salado Substation 115kV.

101.4 MWCapacity
WithdrawnStatus
Market
Solar+BatteryTechnology

Project facts

Canonical nameGOLDWICK SOLAR FARM
Queue ID1377
Statuswithdrawn
Source statusWITHDRAWN
Market
TechnologySolar+Battery
Capacity101.4 MW
StateCalifornia
CountyStanislaus
Point of interconnectionSalado Substation 115kV
Requested (queue) date2017-05-01
Proposed in-service date
Operational date
Withdrawn date2018-03-14
Developer
Utility / transmission ownerPGAE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.