Goleta Energy Storage, LLC (66394_GOLET)

Goleta Energy Storage, LLC is a 60.0 MW battery interconnection project in Santa Barbara, California with a current status of operational.

60.0 MWCapacity
OperationalStatus
CISOMarket
BatteryTechnology

Project facts

Canonical nameGoleta Energy Storage, LLC
Queue ID66394_GOLET
Statusoperational
Source status(OP) Operating
MarketCISO
TechnologyBattery
Capacity60.0 MW
StateCalifornia
CountySanta Barbara
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2024-01-01
Withdrawn date
Developer
Utility / transmission ownerGoleta Energy Storage, LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata