Gonzaga Ridge Battery Facility (68980_GRBF)

Gonzaga Ridge Battery Facility is a 51.8 MW battery interconnection project in Merced, California with a current status of operational.

51.8 MWCapacity
OperationalStatus
CISOMarket
BatteryTechnology

Project facts

Canonical nameGonzaga Ridge Battery Facility
Queue ID68980_GRBF
Statusoperational
Source status(OP) Operating
MarketCISO
TechnologyBattery
Capacity51.8 MW
StateCalifornia
CountyMerced
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2026-09-01
Withdrawn date—
Developer—
Utility / transmission ownerGonzaga Ridge Battery Facility, LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-11-01operational_date—2026-09-01medium
2026-11-01proposed_online_date2026-09-01—medium
2026-11-01statusactiveoperationalhigh
2026-08-02new_project—activehigh

Explore related data

Source last checked2026-11-01
Data last materially changed2026-11-01
Page data generated2026-11-26

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.