Goose Creek 345kV Switchyard (J1021)

Goose Creek 345kV Switchyard is a 200.0 MW wind interconnection project in Piatt County, Illinois with a current status of withdrawn. It is proposed to connect at Goose Creek 345kV Switchyard.

200.0 MWCapacity
WithdrawnStatus
Market
WindTechnology

Project facts

Canonical nameGoose Creek 345kV Switchyard
Queue IDJ1021
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyWind
Capacity200.0 MW
StateIllinois
CountyPiatt County
Point of interconnectionGoose Creek 345kV Switchyard
Requested (queue) date2018-03-12
Proposed in-service date2021-09-01
Operational date2021-09-01
Withdrawn date2020-01-02
Developer
Utility / transmission ownerAMEREN ILLINOIS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata