Gordan Evans 138 kV Substation (GEN-2021-061)

Gordan Evans 138 kV Substation is a 100.0 MW solar interconnection project in Sedgwick, Kansas with a current status of withdrawn. It is proposed to connect at Gordan Evans 138 kV Substation.

100.0 MWCapacity
WithdrawnStatus
KSMarket
SolarTechnology

Project facts

Canonical nameGordan Evans 138 kV Substation
Queue IDGEN-2021-061
Statuswithdrawn
Source statusWITHDRAWN
MarketKS
TechnologySolar
Capacity100.0 MW
StateKansas
CountySedgwick
Point of interconnectionGordan Evans 138 kV Substation
Requested (queue) date2021-04-29
Proposed in-service date2025-12-31
Operational date
Withdrawn date2024-09-16
Developer
Utility / transmission ownerWERE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata